This project features welded stainless steel beam flanges custom-fabricated with over 13 tons of custom laser-cut components. The stainless steel structure supports the glass facade and is finished with a #240 grit surface as required by building codes. The structure consists of 42 beams, each 30 feet long. The consultant team collaborated closely to ensure fabrication, polishing and delivery were completed within the allocated 10-week production schedule.